Layout of in progress work on "Construction Quad", 63" X 48"
After completing quite a few smaller works, it was time to return to "Construction Quad". The hooking (in a 6-cut) was completed and finishing started. Yarns were chosen for the whipped edge. A dark gray will be interrupted on three sides by sections of rust, pink and light green.
The piece has a reference to oceanside homes built as an escape, yet close to the roadways leading one to them. The shapes were derived and pieced together from viewing boats and houses on last year's vacation by the water.
The side piece brings more of the construction process to the work. While other options were designed for this purpose, some were simply too complex and distracted from the main hooked work. They could become works on their own. This is a much simpler, cleaner design. Plumb bobs hang from a painted board with the string brought through drilled holes in the board and coupling nuts resting on top of the board. The strings will be tied off.
Plumb bobs will be allowed to sway freely. The board holding them will be hung with hardware that will show on top, adding to the construction process idea.
No comments:
Post a Comment