Showing posts with label Laura Kenney. Show all posts
Showing posts with label Laura Kenney. Show all posts

Saturday, February 1, 2014

RUG HOOKING COMPLETED ON "WHITE COLLAR", LAURA KENNEY RUG CHALLENGE, STUDIO UPDATE

This week the hooking section of the latest mixed-media work was completed.

"White Collar" in progress.

The next steps are to whip the edges, collage a piece of wood for the top, attach a tie to the center, attach a hanging device and label.  This will probably take a week or longer as I've signed up to be a part of Laura Kenney's rug challenge.  

While looking through my Facebook, I noticed that Laura was calling upon others to join her starting February 3 in what she has named  "Make a Rug Week".  You can keep up with what people are doing this week on Laura's Facebook artist page.

I put in extra time this week to finish up the hooking on "White Collar" and started thinking about a design for the challenge.

I have been wanting to add to previous work I have done with abstract figures, but wanted to work on a larger scale.  This was the time to begin.  I started drawing out the design:

The start of "At the Coast".    30" X 30" Lori LaBerge  2013

The background was roughly drawn in to depict an ocean view.  I will change this slightly as the hooking goes along to get what feels right for the piece.

Next was to do some color planning.  I will need to dye more blues, a light gray and some black.  I would like a brighter orange so will look to see what I have or if I have to dye.  Most of the other colors I was lucky enough to have in my stash.

This will be an intensive one-week project and I hope I haven't pushed myself too far with this as I have never finished a 30 X 30 piece in one week before. It will definitely have to be an 8-cut.  Hooking officially starts on Monday, so I'll let you know how it went next week.

Join a challenge or set up your own and have a great week.

STUDIO UPDATE--

We're getting there!  The plumbing was completed this week, but water will not be turned on until final inspection (which was supposed to be Friday, but was a no-show).  A drain pan has been ordered to place under the washer/dryer.

  The faucet for the dye sink was installed.

And what would a bathroom be without a sink.  We still need to caulk where the tile and sheet rock meet.